How to Schedule Backups with Proxmox Backup Server in Proxmox VE
Proxmox Backup Server stores and manages backup data, but the backup tasks themselves are created and scheduled in Proxmox VE. To set up a backup schedule, first add Proxmox Backup Server (PBS) as storage in PVE, then create scheduled backup jobs.
Updated · Mr.PlanB
Step 1: Add Proxmox Backup Server storage
1. In Proxmox VE, go to Datacenter → Storage → Add → Proxmox Backup Server. 2. Enter the PBS server details, including IP address, datastore, and credentials. 3. Configure optional settings such as retention policy or encryption if you need them. 4. Click Add to finish the storage configuration.
Step 2: Create a backup task schedule
1. Go to Datacenter → Backup → Add. 2. Select the Proxmox Backup Server storage. 3. Choose the VMs or containers to back up. 4. Set the backup mode and schedule. 5. Click Create to save the task.
Backup modes
Stop mode shuts down the VM during the backup for maximum data consistency.
Suspend mode pauses VM activity for the duration of the backup.
Snapshot mode creates a snapshot and backs up while the VM keeps running, which suits production environments.
Scheduling options
Backups can run daily, weekly, monthly, or at specific times such as 2:00 a.m. Automated schedules keep protection consistent and cut down on manual work.
To remove a backup task, use Datacenter → Backup → Remove.
With PBS storage and automated backup schedules configured in PVE, administrators get consistent data protection and dependable recovery.
FAQs
1. Can I include multiple VMs in one backup plan?
Yes. You can select multiple VMs within a single scheduled task.
2. Does PBS execute backups directly?
No. Backup jobs are created and managed in Proxmox VE, while PBS stores the data.
3. Which backup mode is best for production?
Snapshot mode is usually recommended for production environments.
Related guides
More from the backup hub on the same topics.
Need help with backup and recovery?
Use the form below to get in touch about backup strategy, recovery planning, and data protection projects.